Frontier Power
| IFS conducted a study
with the objective of analyzing The Frontier Power Company (FPC)
Headquarters facility to improve the functionality of the existing
offices and respond to serving the electric-related functions,
to plan for additional FPC staff, to integrate the office needs
of Frontier Propane, to update the facility image, and to correct
facility infrastructure issues. |
|
| The purpose of this
study was to plan an office expansion to accommodate the growth
triggered by moving the Frontier Propane operations into the
existing Frontier Power offices. It was assumed that the existing
office area would be renovated and an office addition planned.
This analysis was summarized in a Facility Assessment &
Office Expansion Study Report, which included a Due Diligence
Report, a Design Program, Diagrammatic Preliminary Concept Options
for expansion and renovation, Schematic Design of the expansion
and renovation, and a Schematic Budget Cost Opinion. |
| The Board unaminously
accepted the report and authorized a 3,250 SF renovation and
a 5,360 SF addition. The renovation includes interior renovation
of the Lobby area and Customer Service and Operations offices,
façade improvements, a new metal roof, and HVAC improvements.
The addition includes a multi-purpose Community/Board Room,
catering kitchen and break room, restrooms and offices. A new
geothermal system serves the office areas. |
|